On opening the building elements, we found that the expansion joints have been properly carried out from the bottom up, and around the columns was not at all seams. Screed laid on the ceiling, formed by the overlap of concreted coopers, crumbled and lost its strength, on top of it lay heavily cracked asphalt filler layer, in places of varying heights, creating a real danger of stumbling. For the most visited concert hall in Europe is was unacceptable. "Remmers Today": What it took to do after you have completed the analysis? Volkmann: Originally wanted to lay a seamless concrete floor with steel reinforcement. However, it was expected that the building will experience a load bearing, so it was impossible to eliminate risk of delamination. Therefore, we chose a viscous solid screed "Remmers," based on epoxy resin, which can withstand such a shift and not cracks in the foundation vibrations. "Remmers today": Screed epoxy resin 5 cm thick - a unique case.
As it did? Volkmann: We are all cleaned, the steel supporting beams blast method, all cleaned, treated with the composition for protection against corrosion, and only then did the screed product Remmers Epoxydharz-Estrich. Indeed, the thickness of 5 cm and occasionally up to 9 cm Thereafter, in accordance with the plan targets "Remmers" joints were closed and anti-reflective black bear sealing - the rays of searchlights were not reflected from the floor. My conclusion: we have coped with the task, problem solved! Opinion firm, the product is used: J. Redling Firm "Y.R. Beshihtungszyusteme "firm-shop (address 63 571 Gelnhausen), has 30 years of experience in working with floor coverings. "Remmers today ': No construction site is different.
Were there any specific difficulties with Celebrations Hall in Frankfurt? Redling: Room for rent permanently for events. For the equestrian events, pop concerts, boxing Klitschko meetings, etc. Therefore, the project was divided into three phases, each of We have the leadership of the fair was isolated short period of time not exceeding 14 days, for which we had to cover the entire construction site.

Posted by: |