Monday, November 21, 2011

NEXT POST
Windows Bars In the case of force majeure such lattice is easy to open and get out. This is especially true swing lattices equipped with shut-off device swinging. Swing device is placed directly into the wall of the building, and the actuator (arm) in a building under a window sill or on the side from the window. Unlike a regular lock (plated or mounted), locking device swinging transcend the weather, it does not need a key from the outside access to it is excluded. Sliding bars on the windows (made of type pantograph - a sliding hinged parallelogram) can cover the window openings, where necessary. Sliding lattice are of two types: with the upper suspension (ie, only the top rail) and a lower roller. More popular collapsible gates to the upper suspension, as They have a smooth ride and reliable mechanism. But the grating with the lower roller is also an advantage - it is the price. In general, the sliding of the lattice are very easy to application does not require much space to open, and fully comply with fire regulations. Removable grid mounted between the frames (in mezhokonny aperture) on the screws or bolts. If necessary, For example, when moving, such a grating can be removed. But in terms of fire safety removable grid worthless. Also, remember that they are easier to crack, so it is best to establish such lattice, starting from the second, third floor of the house. Screens in windows: Profiles and bars on the windows installation but its main function - protecting, and can carry another - decorative. Thus the appearance of the lattice depends on from a profile of it was produced. Grilles are made from a metal profile, which differs as to the diameter (and hence the strength), and in form. Possible to produce...
PREVIOUS POST
Original Floors On opening the building elements, we found that the expansion joints have been properly carried out from the bottom up, and around the columns was not at all seams. Screed laid on the ceiling, formed by the overlap of concreted coopers, crumbled and lost its strength, on top of it lay heavily cracked asphalt filler layer, in places of varying heights, creating a real danger of stumbling. For the most visited concert hall in Europe is was unacceptable. "Remmers Today": What it took to do after you have completed the analysis? Volkmann: Originally wanted to lay a seamless concrete floor with steel reinforcement. However, it was expected that the building will experience a load bearing, so it was impossible to eliminate risk of delamination. Therefore, we chose a viscous solid screed "Remmers," based on epoxy resin, which can withstand such a shift and not cracks in the foundation vibrations. "Remmers today": Screed epoxy resin 5 cm thick - a unique case. As it did? Volkmann: We are all cleaned, the steel supporting beams blast method, all cleaned, treated with the composition for protection against corrosion, and only then did the screed product Remmers Epoxydharz-Estrich. Indeed, the thickness of 5 cm and occasionally up to 9 cm Thereafter, in accordance with the plan targets "Remmers" joints were closed and anti-reflective black bear sealing - the rays of searchlights were not reflected from the floor. My conclusion: we have coped with the task, problem solved! Opinion firm, the product is used: J. Redling Firm "Y.R. Beshihtungszyusteme "firm-shop (address 63 571 Gelnhausen), has 30 years of experience in working with floor coverings. "Remmers today ': No construction site is different. Were there any specific difficulties with Celebrations Hall in Frankfurt? Redling: Room for rent permanently for events. For the equestrian events, pop concerts,...